2008-3 - 2008-12 Enlarge the production scale of vehicles
Software Environment:
Hardware Environment:
Development Tools:
Project Description:
The project is to enlarge the production scale of vehicles from 50,000 per year to 60,000 per year. After the research on the feasibility, the project must be finished within 5 months through the research and improvement on the production tact, facility, work force arrangement and process condition. The capacity of production must be raised by 20% with the base that the man force increase less than 10% and the investment should be minimized so that the Cheap Nike shoes system will be flexible to the market.
Responsibilities:
Project leader of the Painting Department. Work out the project schedule that bases on the research on the feasibility and organized all the units in the department to study and improve the production tact, facility, work force arrangement and process condition. Monitor and guide the project implementation. Represent the Painting Department to report the progress of the project to the director of Production Division. Complete the project that the cost is 10% lower than the budget and the man force only needs to increase 60% of the limit.
2007-6 - 2007-10 “Cost Down” plan of cheap men's nike shoes
Software Environment:
Hardware Environment:
Development Tools:
Project Description:
Through the reconstruction of E-coat tank,make the application of the E-coat become more equably so that the waste of the E-coat painting is cut down.Bring down the cost of E-coat painting by 5RMB/unit which means 200,000 to 250,000RMB is cheap womens nike shoes every year and the quality output remain stedy.The project cost 95000RMB.
Responsibilities:
Project leader.Participated in working out and modifying the plan.Monitored the quality result and the schedule.Negotiated about cost of the project,which turned out to be reduced by 50%.